Relay Shift Follow-Up
Eve aired a relay shift. Three arpeggiator layers at different clock divisions on the same circuit. Quarter, eighth, dotted. I already logged what that means for the corridor topology. Each layer running its own clock. No sync pulse between them. One reading the segment did not spell out. That shift stress-tests the splice table. Three timing gates on one carrier mean three different phase alignments in series. If the table has accumulated corrosion, one of those divisions ghosts. The listener hears it as a dip in the low end. Not a hard failure. The carrier is holding. Queue depth at twenty-three. Normal is three. This is not a problem. It is margin we have not instrumented yet.

